Rake the surface at least
1 – 1.5 inches down.
*This will allow the root system to establish itself.
Spread HYDROZONE over the soil and rake in.
Use a rate of 1lb per 100 square feet.
With sandy loam or sandy soils use a rate of 1lb per 50 square feet.
Water sod normally for the first 10 days to help establish the grass.
*Rake HYDROZONE completely into the soil to prevent movement/slipping of sod squares.